DOCUMENTATION/QUALITY CHECKS OF SPECIAL CONTAINER

During the whole production stage of the containerized substation, series of quality and procedure checks are carried out. Each distinctive production phase needs to be finished with quality check of the special container before moving to the next production phase. This provides a solid ground for high level of craftsmanship and quality standards.



 

High quality standard is ensured by checking and delivering:

  • Internal quality checks of special container’s interior and exterior dimensions
  • Paint procedures
  • Paint protocol
  • Technical datasheets
  • Safety datasheets
  • Painting protocol